Transmission Expansion Planning Approach to Minimize Investment Cost Subject to Maximized Reliability Constraint

Publish Year: 1396
نوع سند: مقاله کنفرانسی
زبان: English
View: 411

This Paper With 7 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

COMCONF05_029

تاریخ نمایه سازی: 21 اردیبهشت 1397

Abstract:

In this paper, transmission expansion planning problem from transmission system operator (TSO) point of view is modeled and solved. The developed model, includes the reliability of power system which is one of the most important objectives of TSO.The reliability objective is considered under market-clearing process. Accordingly, bi-level programming model is used. The target of the transmission planning is to maximize system reliability while facilitating energy trading. The upper-level problem is constrained by a collection of lower-level problems representing market clearing with maximum social wale-fare objective. The developed model is mixed integer linear programming method which is solved by GAMS / Cplex

Keywords:

Transmission expansion planning (TEP) , bi-level programming , market clearing , social welfare , reliability

Authors

Shoorangiz Shams Shamsabad Farahani

Department of Electrical Engineering, Islamshahr branch, Islamic Azad University, Islamshahr, Iran

Morteza Rezaei nejad

South Kerman Electrical Distribution Co.