Minimizing total weighted late work and cost of resources’ usage in the resource-constrained project scheduling problem

Publish Year: 1396
نوع سند: مقاله کنفرانسی
زبان: English
View: 253

This Paper With 5 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ICIORS10_103

تاریخ نمایه سازی: 11 شهریور 1397

Abstract:

One of the problems related to resource-constrained project scheduling problem is weighted late work criterion because maybe activities do not have the same importance. In this paper this problem is considered and the objective is to minimize both the total weighted late work and resources cost. linear integer programming has been proposed for this problem. To prove these possible differences between activities an xample is calculated by GAMS and the result is shown

Authors

R Tavakoli-Moghadam

School of Industrial Engineering, Collage of Engineering, University of Tehran, Tehran, Iran

Z Tahaei

School of Industrial Engineering, Collage of Engineering, University of Tehran, Tehran, Iran

E Talebi

School of Industrial Engineering, Collage of Engineering, University of Tehran, Tehran, Iran