A fuzzy two- stage Model approach for Project Portfolio Selection and Scheduling

Publish Year: 1397
نوع سند: مقاله کنفرانسی
زبان: English
View: 400

This Paper With 11 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

IECONF01_002

تاریخ نمایه سازی: 5 آبان 1397

Abstract:

Because of limited resources, Selection of appropriate projects is anextremely important goal for organizations. A poor decision mightnegatively affect the organization in two ways: On the one hand,organizational resources are spent for weak and non-strategic projects,leading to the loss of time and resources, on the other hand, theorganization lose the profit which could be gained by investing theresources in more profitable projects (opportunity cost). Hence, selecting arich portfolio has been always an important concern of project managers.In real world, selection is complicated by uncertainty in input data, therebymaking selection and scheduling more complicated. In this study, thefuzzy Preference Ranking Organization METHod for EnrichmentEvaluation (fuzzy PROMETHEE) is presented for portfolio projectselection and scheduling in fuzzy conditions; in the first stage, projects areranked using qualitative and quantitative criteria through fuzzyPROMETHEE, and in the second stage, higher rank alternatives, areselected and scheduled concerning restrictions.

Keywords:

Authors

Tahereh Heydari

Department of Industrial Engineering, Iran University of Science & Technology, Narmak, Tehran- Iran

Seyed Mohammad Seyed Hosseini

Department of Industrial Engineering, Iran University of Science & Technology, Narmak, Tehran- Iran

Ahmad Makui

Department of Industrial Engineering, Iran University of Science & Technology, Narmak, Tehran- Iran