The Effects of Delay Due to Lot Size in a Shop with Assembled Products

Publish Year: 1383
نوع سند: مقاله کنفرانسی
زبان: English
View: 2,064

This Paper With 9 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

IIEC03_009

تاریخ نمایه سازی: 10 مهر 1385

Abstract:

Master production schedule (MPS) and material requirements planning (MRP) are used for production planning. The objective of this study is to determine the proper lot size in order to increase delivery performance by adjusting priority delay, processing delay, staging delay and requirements delay. The approach used in this paper, is to present the multi-product production planning problem with a bill of materials (BOM) as a network. This representation helps in calculating various delays. Further, the impact of change of lot size on the adjustment of the delays can be easily evaluated using the network and the Gantt chart prepared from the network.

Authors

Iraj Mahdavi

Mazandaran University of Science & Technology, Babol, Iran

Morteza Bagherpour

Mazandaran University of Science & Technology, Babol, Iran

S.Majid Ebrahimi

Mazandaran University of Science & Technology, Babol, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • ENNS, S.T., (2001), MRP Performance effects due to lot size ...
  • FIELDES R and KINGSMAN B., (1997), Demand uncertainty and lot ...
  • K ARM ARKAR, U. S., (1987), Lot sizes, lead times ...
  • MOLINDER, A. , (1 997), Joint optimization of lot sizes, ...
  • نمایش کامل مراجع