Modeling of a Push-Pull Production Control System with Constant WIP and Unreliable Equipment

Publish Year: 1384
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,525

This Paper With 14 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

IIEC04_071

تاریخ نمایه سازی: 7 مهر 1385

Abstract:

Push-pull production control systems can be based on the implementation of just in time (JIT) control in the last stage of production by triggering the production at the first stage when a withdrawal occurs in the last stage. Intermediate stages are operated according to a push system of production. In this paper, a discrete model is developed to study and analyze the behavior of a push-pull system with unreliable equipment at any stage. The model, which is based on an iterative process and implemented on the computer, is also utilized to optimize the buffer capacities at intermediate stages and number of kanbans at the last stage, or final buffer, which is used to trigger the production at the first stage.

Authors

Mehmet Savsar

Kuwait University College of Engineering & Petroleum Department of Industrial & Management Systems Engineering

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Fallow, D. and Browne, J. (1988), *'Simulating Just-In-Time Systems", International ...
  • Sarker, B.R. and Fitzsimmons, J.A. (1989), ،0The Performance of Push-Pull ...
  • Yamashita, H., Nakazawa, K., Nagasuka, H., and Suzuki, S. (1989), ...
  • Olhager, J. and Ostlung, B. (1990), ،An Integrated Push-Pull M ...
  • Wang, H. and Wang, H., (1990), "Determining the Number of ...
  • Golhar, D.Y. and Stamm, C.L. (1991), _ Just-in-Time Philosophy: A ...
  • Hodgson, T.J. and Wang, D. (1991), 4Optimal Hybrid Push/Pull Control ...
  • Golhar, D.Y. and Sarker, B.R. (1992), ، Economic M anufacturing ...
  • Berkley, B.J. (1993), *Setting Minimum Performance Levels _ Two-Card Kanban- ...
  • Wang, H. and Xu, C. (1997), 4Hybrid Push/Pull Production Control ...
  • Analysis of Just-In-Time Production Simulation؛، , (1995) [15] Savsar, M. ...
  • Savsar, M. (1996), ،Effects of Kanban Withdrawal Policies and Other ...
  • Analysis of a Push-pull System for an Electronic Simulation؛، , ...
  • Savsar, M. and Choueiki, H. M. (2000), ،A Neural Network ...
  • Beamon, B.M. and Bermund, J.M. (2000), ،0A hybrid push-pull control ...
  • Duri, C., Frein, Y., and Dimascolo, M. (2000), _ Comparison ...
  • Kelton, W.D., Sadowski, R. P., and Sadowski, D.A., 2002 Simulation ...
  • Hillier, F.S. and So, K. C. (1991), _ Effect of ...
  • Hillier, F.S., So, K. C., and Boling, R. W. (1993), ...
  • Papadopoulos, H. T., and Vouros, G. A.(1996), 4A Model Management ...
  • Savsar, M. and Youssef, A. S. (2004), ،An Integrated S ...
  • نمایش کامل مراجع