An Application of non-Parametric resampling interval analysis to Risk-Based Earned Value Management
Publish place: 10th International Industrial Engineering Conference
Publish Year: 1392
نوع سند: مقاله کنفرانسی
زبان: English
View: 966
This Paper With 7 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IIEC10_018
تاریخ نمایه سازی: 10 شهریور 1393
Abstract:
Control in complex systems in uncertainty conditions is one of the significant challenges for project managers. Therefore, in this paper an integrated approach based on Earned value management and risk analysis methods proposed to decrease deviations in time and cost estimation at complete. Using the proposed performance indexes based on risk scores obtained by non-parametric resampling technique, namely bootstrap, calculating more accurate estimations of final cost and duration at lower and upper band with various confidence levels will be possible. Finally, an illustrative case study presented in a software project.
Keywords:
Earned value management , risk analysis , Cost & Time Estimation at Complete , Software Engineering and Management , Non-Parametric Bootstrap Technique
Authors
Seyedmohammad Seyedhoseini
Industrial Engineering Department Iran University of Science and Technology Tehran, Iran
Saeed Yaghoubi
Industrial Engineering Department Iran University of Science and Technology Tehran, Iran
Afshin Kamyabniya
Industrial Engineering Department Iran University of Science and Technology Tehran, Iran
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :