Improved critical-chain Multi-project planning: Using more realistic assumptions
Publish place: 10th International Industrial Engineering Conference
Publish Year: 1392
نوع سند: مقاله کنفرانسی
زبان: English
View: 923
This Paper With 5 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IIEC10_085
تاریخ نمایه سازی: 10 شهریور 1393
Abstract:
This paper addresses the problem of multi-project planning using critical chain concept, while considering more realistic assumptions, such as: precedence relations among projects, bottleneck resource transfer times, resource constraint considerations, and the condition that all projects may not need the bottleneck resource. Two algorithms with different assumptions are presented and the results of planning multi-project test problems, using the two different algorithms are presented.
Keywords:
Authors
Setareh Torabzadeh
Department of Industrial Engineering, University of Tehran, Tehran, Iran
Siamak Haji yakhchali
Department of Industrial Engineering, University of Tehran, Tehran, Iran
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :