Cost/time trade off investigation of spherical storage tank construction projects using MOPSO/NSGAII
Publish place: 10th International Industrial Engineering Conference
Publish Year: 1392
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,381
This Paper With 6 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IIEC10_176
تاریخ نمایه سازی: 10 شهریور 1393
Abstract:
This paper proposes two multi-objective evolutionary algorithms of multi-objective particle swarm optimization (MOPSO) and non-dominated sorting genetic (NSGA-II) to solve the time-cost tradeoff problem of spherical storage tank construction projects. Using multi-objective algorithms to optimize the cost and the time of construction project enables one to obtain a Pareto front solution as a set of optimum solutions for project completion with different options of time and cost.
Keywords:
Authors
Vida Arabzadeh
Industrial Engineering Dept. Islamic Azad University, Qazvin Branch,Qazvin, Iran
Niaki
Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran
Vahid Arabzadeh
Process System Engineering Dept.Aalto University, Helsinki, Finland