An Integrated Risk-Based Technique for Project Plan Selection
Publish place: International Journal of Industrial Engineering & Production Research، Vol: 20، Issue: 1
Publish Year: 1388
نوع سند: مقاله ژورنالی
زبان: English
View: 629
This Paper With 10 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_IJIEPR-20-1_004
تاریخ نمایه سازی: 7 شهریور 1393
Abstract:
Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Acyclic Graph (DAG) into the project risk analysis. This scheme is used to estimate the expected impacts of the occurrence of the project risks on the project cost and the project time. Also, a theoretical model is defined to provide integration between project risk analysis and overall project planning using the breakdown structures. We believe that applying the proposed technique helps the companys managers in most effective manner dealing with his complicated project plan assessment and selection problems. The application of the technique was implemented in the companies in construction industry in which represented a considerable cost and time improvements.
Keywords:
Project plan selection , Project risk analysis , Quantitative risk analysis , Overall project risk , Efficient Frontier , Directed Acyclic Graph (DAG)
Authors
S. Mohammad Seyedhoseini
S. Mohammad Seyedhoseini, Ph.D., P.E., Industrial Engineering department, Iran University of Science & Technology, Tehran, Iran
M. Ali Hatefi
M. Ali Hatefi, Ph.D., Industrial Engineering department, Iran University of Science & Technology, Tehran, Iran.