A Multi-Objective Programming to Increase Labor Efficiency of a Truck Hub: A Case Study
Publish place: International Journal of Industrial Engineering & Production Research، Vol: 23، Issue: 2
Publish Year: 1391
نوع سند: مقاله ژورنالی
زبان: English
View: 638
This Paper With 8 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_IJIEPR-23-2_008
تاریخ نمایه سازی: 7 شهریور 1393
Abstract:
The problem of staff scheduling at a truck hub for loading and stripping of the trucks is an important and difficult problem to optimize the labor efficiency and cost. The trucks enter the hub at different hours a day, in different known time schedules and operating hours. In this paper, we propose a goal programming to maximize the labor efficiency via minimizing the allocation cost. The proposed model of this paper is implemented for a real-world of a case study and the results are analyzed.
Keywords:
Authors
S.J. Sadjadi
Dept. Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
A. Alinezhad Esboei
Dept. Industrial Engineering, Iran University of Science and Technology, Tehran, Iran