Prediction of maximum surface settlement caused by earth pressure balance shield tunneling using random forest
Publish Year: 1396
نوع سند: مقاله ژورنالی
زبان: English
View: 283
This Paper With 9 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_JADM-5-1_012
تاریخ نمایه سازی: 19 تیر 1398
Abstract:
Due to urbanization and population increase, need for metro tunnels, has been considerably increased in urban areas. Estimating the surface settlement caused by tunnel excavation is an important task especially where the tunnels are excavated in urban areas or beneath important structures. Many models have been established for this purpose by extracting the relationship between the settlement and the factors that influence it. In this paper, Random Forest (RF) is introduced and investigated for the prediction of maximum surface settlement caused by EPB shield tunneling. Various factors that affect this settlement, including geometrical, geological and shield operational parameters were considered. The results of RF model has been compared with the available artificial neural network (ANN) model. It is shown that the proposed RF model provides more accurate results than the ANN model proposed in the literature.
Keywords:
Authors
V. R. Kohestani
Department of Civil Engineering, Central Tehran Branch, Islamic Azad University, Tehran, Iran.
M. R. Bazarganlari
Department of Civil Engineering, East Tehran Branch, Islamic Azad University, Tehran, Iran
J. Asgari marnani
Department of Civil Engineering, Central Tehran Branch, Islamic Azad University, Tehran, Iran