Cycle Time Analysis of Precast Concrete Installation by Artificial Neural Networks

Publish Year: 1392
نوع سند: مقاله کنفرانسی
زبان: English
View: 936

This Paper With 7 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

NCCE07_1527

تاریخ نمایه سازی: 16 مهر 1392

Abstract:

Precast concrete elements are generally used to provide faster project duration and higher quality construction projects. These elements are widely used in residential and commercial buildings across Singapore. However, there are many factors affecting productivity of precast construction which should be considered to provide more accurate estimates of activities such as production and erection of precast elements. The main objective of this study is to assess the productivity and analyze the cycle time for precast erection process using Artificial Neural Networks (ANN). Primary data for the study were collected through site visits. High prediction capability of the develop ANN showed the potential use of such a technique by construction managers and general estimators for their scheduling purposes

Authors

Ali Najafi

PhD Candidate, School of Civil Eng., Nanyang Technological University, Singapore

Robert Tiong

Associate Professor, School of Civil Eng., Nanyang Technological University, Singapore

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • _ Congress on Civi Engineering, 7-8 May 2013 University of ...
  • Hola, B. and K. Schabowicz, Estimation of earthworks execution time ...
  • Han, S., et al., Technical comparisons of sim ulation-based productivity ...
  • Tam, C.M., T.K.L. Tong, and S.L. Tse, Modelling hook times ...
  • Zayed, T.M. and D.W. Halpin, Pile construction productivity assessment. Journal ...
  • نمایش کامل مراجع