Resource leveling in construction projects using simulated annealing with activity splitting allowed and limited resource availabilities

Publish Year: 1393
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,461

This Paper With 8 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

NCCE08_0318

تاریخ نمایه سازی: 5 مهر 1393

Abstract:

It is obvious that the most of the stakeholders in a construction project would like to complete the project without any delay and excessive cost. It is possible to meet these objectives by using resource managementtechniques in a project. One of these techniques is resource leveling that assures the contractors that theproject can be completed on time and at cost. Due to the limitations of the availability of the resources and their different types in construction projects, it is more significant to use resource leveling in such projects. As a result, many researchers have applied different optimization algorithms to this problem. In this papera meta-heuristic simulated annealing resource leveling model is presented. The novelty of this model liesin its assumptions, consisting of the simultaneous allowing the splitting of the activities and considering the limited resource availabilities

Authors

Sayed Madeh Piryonesi

Graduated Student, School of Civil Engineering, University of Tehran

Mehran Nasseri

Graduated Student, Department of Industrial Engineering, Sharif University of Technology

Mehdi Tavakolan

Graduated Student, Assistant Professor, School of Civil Engineering, University of Tehran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Project Management Institute. (2007), :Practice Standard for Scheduling, " Project ...
  • J6zefowska, J. and Weglarz, J. (2006), "Perspectives in Modern Project ...
  • Hendrickson, C. (2003), "Project Management for Construction, " Prentice Hall, ...
  • Harris, R. B. (1978), :Precedence and Arrow Networking Techniques for ...
  • El-Rayes, K. and Jun, D. (2009). "Optimizing Resource Leveling in ...
  • Easa, S.M. (1989). :Resource leveling in construction by optimization, " ...
  • Leu, S. S., Yang, C. H. and Huang, J. C. ...
  • _ _ _ _ _ _ _ _ Management, ASCE, ...
  • Rieck, J. Zimmermann, J. and Gather, T (2012). "Mixed-Integer Linear ...
  • Harris R.B. (1990). "Packing Method for Resource Leveling (PACK), ; ...
  • Padilla, E. and Carr, R. (1991). :Resource Strategies for Dynamic ...
  • Wiest J.D and Levy, F.K. (1977). _ Management Guide to ...
  • Antill, J. M. and Woodhead, R.W. (1982). :Critical Path Methods ...
  • Moder, J.J., Philips, C.R. and Davis E.W.(1983). "Project Management with ...
  • Hossein Hashemi Doulabi, S., Seifi, A., and Shariat, S. (2011). ...
  • Damci, A. Arditi, D. and Polat, G. (2013). _ Multi-resource ...
  • Geng, J. Weng, L. and Liu, S. (2011). _ Improved ...
  • Alsayegh, H. and Hariga, M. (2012). "Hybrid Meta-heuristc Methods for ...
  • Ponz-Tienda, J. L. Yepes, V. Pellicer, E. and Moreno-Flores, J. ...
  • New Tabn Search-based Hyper-heuristic Algorithm A:ه 20. Koulinas, G.K. and ...
  • Kirkpatrick, S., Gelatt, Jr., C.D. and Vecchi, M.P. (1983). "Optimization ...
  • Cerny, V. (1985). _ Th ermodynamic Approach _ the Traveling ...
  • Bertismas, D. and Tsitsklis, J (1993). "Simulated Annealing, " Journal ...
  • Henderson, D. Jacobson, S. H. Johnson, A. W. (2003). "Handbook ...
  • Eglese, R.W. (1990). :Simulated Annealing: A Too] for Operational Research, ...
  • Hegazy, T. (1999). "Optimization of Resource Allocation and Leveling using ...
  • Nascimento, V. B. and Carvalho, V. E. (1999). _ Simulated ...
  • نمایش کامل مراجع