Stability analysis of tunnel Using the Natm Method Case Study: 4th tunnel of Firoozkooh road

Publish Year: 1396
نوع سند: مقاله کنفرانسی
زبان: English
View: 522

This Paper With 9 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

RCEAUD04_014

تاریخ نمایه سازی: 7 اسفند 1396

Abstract:

This paper analyzes the stability of the tunnel using natm method. The main objective of the failure is to create an external semi-rigid arc immediately after drilling with materials such as concrete, screw, etc. This will cause tension in the area around the tunnel and prevent deterioration. Shows that score Q = 4/52, and later equivalent = 12.4, and use only 2.9 meters long single Bolt single rock and a flat shutter with a thickness of 7 to 12 cm.

Keywords:

Authors

Alireza Afradi

Ph.D. Student of Mining Engineering, Qaemshahr Branch, Islamic Azad University, Qaemshahr, Iran

Siamak Rezazadeh

Assistant Professor and Head of the Department of Mining and Geology, Qaemshahr Branch, Islamic Azad University, Qaemshahr, Iran