Superior Modeling of Hard Rock TBM Performance Using Novel Predictive Analytics Methodologies
Publish place: 3rd International Conference on Applied Researches in Structural Engineering and Construction Management (secm2019)
Publish Year: 1398
نوع سند: مقاله کنفرانسی
زبان: English
View: 378
This Paper With 11 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
SECM03_146
تاریخ نمایه سازی: 9 شهریور 1398
Abstract:
In the past decades, TBM performance analysis takes paramount importance among several project management and underground space technology problems on account of its impact on cost estimation, time planning, efficiency improvement and other relative issues. The main aim of this paper is to propose new superior equations for TBM performance prediction in hard rock conditions. The Gene Expression Programming (GEP), and models through the Imperialistic Competitive Algorithm (ICA), are developed in this study, as novel predictive analytics methodologies. The proposed models of this study improve the accuracy of predictive equations developed through a database of TBM performance in one of the most complex tunneling projects in the world.
Keywords:
Performance prediction , Tunnel boring machine (TBM) , Predictive modeling , Gene expression programming (GEP) , Imperialist competitive algorithm (ICA).
Authors
Masoud Zare Naghadehi
University of Nevada, Reno, USA
Masoud Samaei
University of Tabriz, Tabriz, Iran
Masoud Ranjbarnia
University of Tabriz, Tabriz, Iran