Assessing the effect of delay blasting on measuring the size distribution of blasted rock at Alvand Qoly limestone mine

Publish Year: 1393
نوع سند: مقاله کنفرانسی
زبان: English
View: 944

This Paper With 6 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

SMFE01_067

تاریخ نمایه سازی: 15 بهمن 1393

Abstract:

The degree of fragmentation plays an important role in order to control and minimize the loading, hauling, and crushing costs. The purpose of this study is to measure the size distribution of blasted rock using Gold size software. Site of study is a limestone quarry producing limestone for Kurdestan cement company. Fragmentation analysis by digital image processing is a low cost and quick method. Gold size is one of the digital image software developed to compute the size distribution of fragmented rock from digital images. Results show that delay blasting was decreased the size of fragmented rock and energy consumption for crushing rock.

Keywords:

Fragmentation , Alvand Qoly Limestone mine , Blasted rock , Gold size software

Authors

Mehdi Hosseini

Assistant Professor, Imam Khomeini international University,

Mehdi Seifi baghikhani

M.SC Student, Imam Khomeini international University

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • SNational Congress on Soil Mechanics and Foundation Engineering Shahid Rajaee ...
  • Gold Size Associates Inc. (2000) "Manual Goldsize". Verison 2.0. ...
  • Rezai, B. (1996) "mineral processing technology". publisher Noor. ...
  • نمایش کامل مراجع