CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Resource leveling in construction projects using simulated annealing with activity splitting allowed and limited resource availabilities

عنوان مقاله: Resource leveling in construction projects using simulated annealing with activity splitting allowed and limited resource availabilities
شناسه ملی مقاله: NCCE08_0318
منتشر شده در هشتمین کنگره ملی مهندسی عمران در سال 1393
مشخصات نویسندگان مقاله:

Sayed Madeh Piryonesi - Graduated Student, School of Civil Engineering, University of Tehran
Mehran Nasseri - Graduated Student, Department of Industrial Engineering, Sharif University of Technology
Mehdi Tavakolan - Graduated Student, Assistant Professor, School of Civil Engineering, University of Tehran

خلاصه مقاله:
It is obvious that the most of the stakeholders in a construction project would like to complete the project without any delay and excessive cost. It is possible to meet these objectives by using resource managementtechniques in a project. One of these techniques is resource leveling that assures the contractors that theproject can be completed on time and at cost. Due to the limitations of the availability of the resources and their different types in construction projects, it is more significant to use resource leveling in such projects. As a result, many researchers have applied different optimization algorithms to this problem. In this papera meta-heuristic simulated annealing resource leveling model is presented. The novelty of this model liesin its assumptions, consisting of the simultaneous allowing the splitting of the activities and considering the limited resource availabilities

کلمات کلیدی:
Resource leveling, Simulated annealing, Meta-heuristic, Splitting

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/295766/