Impacts of Engineering, Planning and Communication on Construction Productivity

Publish Year: 1389
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,910

This Paper With 17 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

IPMC06_028

تاریخ نمایه سازی: 1 شهریور 1389

Abstract:

These days, in the competitive economical situation, productivity has become one of the most important issues in all industries. Among these industries, construction, especially in mega projects, is more critical. This article aims at realizing factors and suggestions for improving construction productivity of oil mega projects in Iran. There are several factors which can affect the construction productivity but based on literature review, the team interest, and work experience background, Planning, Engineering, and Communication areas have been selected to do the research on. This research describes the effects of these three factors and their sub-factors on construction productivity, prioritizes them and finds out improvement suggestions and recommendations based on opinions surveyed by eight interviews done with very well experienced project and construction managers as well as 28 filled questionnaires which have been distributed among project managers through e-mails and in person methods

Authors

Fariborz Esmaeeli Javadi Langeroudi

Students of Project Management in University of Calgary

Gholamreza Safaiefar

Students of Project Management in University of Calgary

Soroush Maghsoudi

Students of Project Management in University of Calgary

Rouhollah Mobtadi

Students of Project Management in University of Calgary

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • C _ structability _ design ...
  • Design changes Avoid Fast Tracking ...
  • Develop Project charter ...
  • WBS, CPM and Scheduling ...
  • Resource Estimation and detailed executive plan ...
  • Human resource planning ...
  • Financial Planning, Cash flow ...
  • Risk management planning ...
  • نمایش کامل مراجع