CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Techno-economic Feasibility Study of the Gunde Teklehaymanote Micro-hydropower Plant at Tindwat River, Central Gondar, Ethiopia

عنوان مقاله: Techno-economic Feasibility Study of the Gunde Teklehaymanote Micro-hydropower Plant at Tindwat River, Central Gondar, Ethiopia
شناسه ملی مقاله: JR_IJEE-11-2_006
منتشر شده در شماره 2 دوره 11 فصل در سال 1399
مشخصات نویسندگان مقاله:

A. K. Belay - Mechanical Engineering Department, Institute of Technology, University of Gondar, Gondar, Ethiopia
D. Atenafu - Hydraulics Engineering Department, Institute of Technology, University of Gondar, Gondar, Ethiopia
S. Birhan - Electrical and Computer Engineering Department, Institute of Technology, University of Gondar, Gondar, Ethiopia
T. Tegengn - Mechanical Engineering Department, Institute of Technology, University of Gondar, Gondar, Ethiopia

خلاصه مقاله:
Ethiopia has a high potential for water for hydro-power development. Even though there is untapped potential, the country s electricity coverage is poor. This paper presents a technical-economic feasibility study of gunde micro hydropower at the Tindwat River, Central Gondar, Ethiopia. In the techno-economics study, the analysis was made for energy modeling, economic scenarios, and sensitivity, risk, and emission analyses. The study shows that this mini-hydropower project can be developed with an installed power of 18 kW, where the Kaplan turbine is recommended. The construction of small scale hydropower in the tindwat river is technically and economically feasible with total net present cost of US $ 253537, cost of energy $0.09/kWh, simple payback period of 6.9 years, and internal rate of return 23.9%. Te result also shows that construction of hydropower curtails greenhouse gas emissions of carbon dioxide by 588.65m3 of gasoil per year. It also showed that small hydroelectric power generation from Tindwat River would improve the electricity supply to Gunde Teklehaymanote monstery and off-grid rural communities.

کلمات کلیدی:
Prefeasibility Analysis, Small Hydro Power, Tindwat River, Turbines

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/1035815/