Investigating the cause of failure in coiled tubing after acidizing operation (real case)

Publish Year: 1399
نوع سند: مقاله کنفرانسی
زبان: English
View: 257

This Paper With 7 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

CARSE05_017

تاریخ نمایه سازی: 17 آذر 1399

Abstract:

Oil Exploration Operations Company (OEOC) is one of the most reputable private companies in the upstream sector of Iranian oil and gas industry. OEOC has obtained latest technical knowledge and vast experiences in the upstream of oil and gas projects. The company commenced its operation in two different fields of exploration operations and integrated drilling services. In one of acidizing operation was found that in addition to the low tube working hours the roll-on and cutting operation of the connector was easier than the previous tubes. To investigate this problem Optical Metallography test, Tensile test, Hardness test, Flattening Test and Flaring Test were defined. after evaluating the test results and checking with the operation unit, it was found that this tube has been used in several previous operations for widespread acidizing, which is also not a standard solution for acid, so reduces the life of the tube.

Authors

Reza Azari

Undergraduate, Ferdowsi University of Mashhad, Mashhad, Iran

Hadi Ghasemi

Head of Technical Inspection, Oil Exploration Operations Company, Tehran, Iran,

Mostafa Sajadi

Head of Coiled tubing Unit, Oil Exploration Operations Company, Tehran, Iran