Risk assessment of marine construction projects using Taguchi Loss Function

Publish Year: 1398
نوع سند: مقاله ژورنالی
زبان: English
View: 256

This Paper With 10 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_IJCOE-3-3_004

تاریخ نمایه سازی: 15 بهمن 1399

Abstract:

Today complicated and risky environment makes risk assessment and identification one of the main steps of proper project management and realization of project objectives. Marine construction projects are key and strategic projects, and their specific nature adds to their importance. This study aimed to propose a method for risk assessment and ranking critical risks in marine construction projects in Iran. To this end, the risk assessment team was formed to identify serious marine construction project risks using risk breakdown structure. Afterward, the team defined risk assessment measures. All risks were assessed in each criterion based on the Taguchi loss function. It allowed decision-makers to define a measurable risk threshold for each criterion and assess risks by developing a common language called loss score. Finally, critical risks were determined based on their priority. The results can be used to improve effective risk management, and consequently, project management. 

Authors

Amir Reza Valyani

Department of Management, Tabriz Branch, Islamic Azad University, Tabriz, Iran

Naser Feghhi Farahmand

Department of Management, Tabriz Branch, Islamic Azad University, Tabriz, Iran

Soleyman Iranzadeh

Department of Management, Tabriz Branch, Islamic Azad University, Tabriz, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Rezaie, A., Sadeghi, B., Roostayi, S. & Nazari, S. (2017): ...
  • Guneri, A. F., & Gul, M. (2013). Prioritization of risk ...
  • ABS, (2000). Guidance notes on risk assessment application for the ...
  • Marle, F. (2014). A structured process to managing complex interactions ...
  • Hillson, D. (1999). Developing effective risk responses. Paper presented at ...
  • Gul, M., Guven, B., & Guneri, A.F. (2018). A new ...
  • Marhavilas, P.K., Koulouriotis, D., & Gemeni, V. (2011). Risk analysis ...
  • Deloitte & Touche LLP. (2012), Risk Assessment in Practice, Committee ...
  • Aven, T. (2016). Risk assessment and risk management: Review of ...
  • Lee, E., Park, Y. & Shin, J. G. (2009). Large ...
  • Zegordi, S.H., Rezaee Nil, E., & Nazari, A., (2012). Power ...
  • Mohammadi, A. & Jafari, S.M. (2008). Risk management in Marine ...
  • Mehdikhani, M. (2015). Risk assessment and aanagement of maritime construction ...
  • Khatami Firoozabadi, S.M.A., Vafadar Nikjoo, A., & Shahabi, A. (2013). ...
  • Golzar Ragheb, S., Mousavi, S.M., Gitinavard, H., Vahdani, B. (2016). ...
  • Lambert, J.H., Haimes, Y., Li, D., Schooff, R., Tulsiani, V., ...
  • Shen, L.Y. & Tam, Vivian. (2002). Implementation of environmental management ...
  • Project Management Institute. (2017). A guide to the project management ...
  • Veritas, N.D., (2002). Marine risk assessment. Offshore Technology Report, http://www.hse.gov.uk ...
  • Ebrahimnejad, S., Mousavi, S.M., & Seyrafianpour, H., (2010). Risk identification ...
  • Taguchi, G., Elsayed, E.A., & Hsiang, T.C., (1989). Quality engineering ...
  • Magdalena, R. (2012). Supplier selection for food industry: a combination ...
  • Pi, W. N., & Low, C. (2005). Supplier evaluation and ...
  • Bryan Kethely, R. (2008), Using Taguchi Loss Functions to Develop ...
  • Zhang, Z. and X, Chu. (2011). "Risk prioritization in failure ...
  • Rezaie, A., Sadeghi, B., Roostayi, S. & Nazari, S. (2017): ...
  • Guneri, A. F., & Gul, M. (2013). Prioritization of risk ...
  • ABS, (2000). Guidance notes on risk assessment application for the ...
  • Marle, F. (2014). A structured process to managing complex interactions ...
  • Hillson, D. (1999). Developing effective risk responses. Paper presented at ...
  • Gul, M., Guven, B., & Guneri, A.F. (2018). A new ...
  • Marhavilas, P.K., Koulouriotis, D., & Gemeni, V. (2011). Risk analysis ...
  • Deloitte & Touche LLP. (2012), Risk Assessment in Practice, Committee ...
  • Aven, T. (2016). Risk assessment and risk management: Review of ...
  • Lee, E., Park, Y. & Shin, J. G. (2009). Large ...
  • Zegordi, S.H., Rezaee Nil, E., & Nazari, A., (2012). Power ...
  • Mohammadi, A. & Jafari, S.M. (2008). Risk management in Marine ...
  • Mehdikhani, M. (2015). Risk assessment and aanagement of maritime construction ...
  • Khatami Firoozabadi, S.M.A., Vafadar Nikjoo, A., & Shahabi, A. (2013). ...
  • Golzar Ragheb, S., Mousavi, S.M., Gitinavard, H., Vahdani, B. (2016). ...
  • Lambert, J.H., Haimes, Y., Li, D., Schooff, R., Tulsiani, V., ...
  • Shen, L.Y. & Tam, Vivian. (2002). Implementation of environmental management ...
  • Project Management Institute. (2017). A guide to the project management ...
  • Veritas, N.D., (2002). Marine risk assessment. Offshore Technology Report, http://www.hse.gov.uk ...
  • Ebrahimnejad, S., Mousavi, S.M., & Seyrafianpour, H., (2010). Risk identification ...
  • Taguchi, G., Elsayed, E.A., & Hsiang, T.C., (1989). Quality engineering ...
  • Magdalena, R. (2012). Supplier selection for food industry: a combination ...
  • Pi, W. N., & Low, C. (2005). Supplier evaluation and ...
  • Bryan Kethely, R. (2008), Using Taguchi Loss Functions to Develop ...
  • Zhang, Z. and X, Chu. (2011). "Risk prioritization in failure ...
  • نمایش کامل مراجع