Determining the risk of critical activities in organizational life management system based on ISO 22301 standard (case study: Municipality of district 1of Tehran)
Publish place: Rescue and Relief، Vol: 10، Issue: 1
Publish Year: 1396
نوع سند: مقاله ژورنالی
زبان: English
View: 171
This Paper With 15 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
این Paper در بخشهای موضوعی زیر دسته بندی شده است:
- شهرداری ها > شهرداری
- شهرداری ها > مدیریت بحران شهری
- مدیریت بحران > مدیریت بحران
- شهرداری ها > شهرداری تهران
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_JORAR-10-1_003
تاریخ نمایه سازی: 23 بهمن 1399
Abstract:
Background: Paying attention to the operational processes of emergency or crisis management has widened in the country that can be cited the legal requirements of the prospectus document at 1404 horizons and the policies of the system related to establishing responsible organizations for crisis management. Business Continuity Management Systems (BCMS) with the requirements of ISO 22301 are factors reducing potential hazards for key activities of the municipality of Tehran. This research describes the standard challenges in the municipality of Tehranchr('39')s district.
Method: This descriptive-applied research, crisis cases are identified by using questionnaires, interviews, and group seminars through Delphi method. In the following, by analyzing the consequences Business Impact Analysis (BIA) in four major missions such as safety, health, credibility of the organization and citizenschr('39') dissatisfaction, important events of crisis were identified using the relative weighting indicator. At the final stage of Delphi, the consensus reached its ultimate goal by assessing the probability of occurrence and severity of events, the unacceptable risk determines
Findings: The findings showed that the average score is more than mean, if the subjectchr('39')s score on the Likert scale is higher than the median, the attitude toward the subject is considered positive. At 99% confidence level, Kolmogorov-Smirnov test was significant (p-value=0.05). Therefore, a nonparametric test should be used. Spearman correlation coefficients were the largest among the research variables (0.559). In the risk analysis section, the risk number of disruptive events of vital activity was derived from the probability and severity of the event between 1 to 16.
Conclusion: By analyzing the outcomes of Business Impact Analysis ((BIA) from six main operating factors of organization services such as violation of laws, financial damages, environment, social and security consequences, organizational credibility, possible risk of any outcome at stopping the activity is calculated by considering the probability of occurrence and velocity of the event. In order to achieve the first priority of municipality activities, with the Delphi method, in several steps, priorities out of 208 critical activities fell to 56 and 38 respectively. Finally, a final agreement was reached on the 10 main activities. More important events for the first year include waste collection, snow removal, IT support services, emergency management, management of emergency response, and emergency services.The maximum number of risks obtained for the emergency event is related to lack of coordination between organizations, traffic problems, and blocking the roads, lack of preparation and earthquake above six Richter.
Keywords:
Authors
Mohammad Moradi
Municipality
Keivan Fatehimanesh
Tehran municipality, district ۱
Seyed Mohammad Hossain Nouri Rahimabadi
Azad Islamic University of Qods
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :