Non-linear mathematical model for unrelated parallel machine scheduling problem with integer programming approach

Publish Year: 1400
نوع سند: مقاله کنفرانسی
زبان: English
View: 181

This Paper With 8 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ONSM01_052

تاریخ نمایه سازی: 31 مرداد 1400

Abstract:

This study deals with the Unrelated Parallel Machine Scheduling problem with release date andpreemption constraint. The objective function is minimizing total weighted earliness and tardiness. Thisproblem is formulated as a non-linear mathematical model with integer programming approach. Then,this model is validated using a mathematical model from previous research.

Keywords:

Unrelated Parallel Machine Scheduling , Release date , Preemption , SA

Authors

Nasim Kangarloo

Department of Industrial Engineering, Kharazmi University, Tehran, Iran