Construction Project Risk Analysis Based on Fuzzy Analytical Hierarchy Process (F-AHP): A Literature Review
Publish place: Advance Researches in Civil Engineering، Vol: 3، Issue: 3
Publish Year: 1400
نوع سند: مقاله ژورنالی
زبان: English
View: 147
This Paper With 20 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_ARCE-3-3_001
تاریخ نمایه سازی: 23 آبان 1400
Abstract:
In a construction project, it generally takes a long time and is complex in nature, giving rise to uncertainty which in turn leads to risks. The impact of risk can affect the cost, quality and timing of project implementation. At each stage of the project, various risks and uncertainties are inseparable. To reduce the adverse impact on the achievement of the functional objectives of a construction project, it is necessary to carry out a risk assessment. Risk is a logical combination of probability and impact and it is necessary to use fuzzy logic to model the inaccuracy and uncertainty of human thinking. This study aims to compare the results of Risk Assessment with the Fuzzy Analytical Hierarchy Process (F-AHP) method against the risk variables identified in the Risk Management Project. From ۳۰ journals reviewed, it shows that technical risk is the biggest risk in a construction project.
Keywords:
Authors
Maria Magdalena Yuliatti
Department of Civil Engineering, Mercu Buana University, Jakarta, Indonesia
Humiras Hardi Purba
Industrial Engineering Department, Mercu Buana University, Jakarta, Indonesia
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :