CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Stakeholders’ Perception on Critical Cost Variation Factors in Malaysian Building Projects

عنوان مقاله: Stakeholders’ Perception on Critical Cost Variation Factors in Malaysian Building Projects
شناسه ملی مقاله: JR_CEJ-4-9_015
منتشر شده در September در سال 1397
مشخصات نویسندگان مقاله:

Samiullah Sohu - Faculty of Civil and Environmental Engineerring, Universiti Tun Hussein Onn Malaysia, Part Raja ۸۶۴۰۰, Johor, Malaysia
Abd Halid Abdullah - Faculty of Civil and Environmental Engineerring, Universiti Tun Hussein Onn Malaysia, Part Raja ۸۶۴۰۰, Johor, Malaysia
Sasitharan Nagapan - Faculty of Civil and Environmental Engineerring, Universiti Tun Hussein Onn Malaysia, Part Raja ۸۶۴۰۰, Johor, Malaysia
Ahsan Ali Buriro - Quaid e Awam University of Engineering College of Engineering Science and Technology, Larkano, Pakistan
Kaleemullah - Faculty of Civil and Environmental Engineerring, Universiti Tun Hussein Onn Malaysia, Part Raja ۸۶۴۰۰, Johor, Malaysia

خلاصه مقاله:
Effective cost management is one of the prime requirements for successful completion of construction projects. However, deviation from initially planned cost had been prevalent in construction projects. Cost variation has become a frequent phenomenon in construction projects and Malaysian building projects has no exclusion. This paper aims to establish the critical factors instigating cost variation in Malaysian building projects. Extensive literature review and field survey were two main methods for conducting this study. ۳۴ factors causing cost variation were identified through deep literature review. A questionnaire survey based on identified factors, was carried out among construction stakeholders: clients, consultants and contractors involved in handling of building projects in Malaysia. The collected data was analyzed using SPSS V۲۲ software, which enabled the ranking of factors based on their Mean Value. The results of the survey indicated that (۱) fluctuation in cost of materials, (۲) improper planning, (۳) Incompetent main contractors, (۴) poor site management, (۵) and client financial problems were top five critical factors causing cost variation in building projects. The inferences drawn in this study can serve as a guide lines for construction stakeholders to achieve effective cost management in building projects.

کلمات کلیدی:
Cost Management; Critical Factors; Cost Variation; Building Projects