Assessment Optimization of Safety and Health Risks Using Fuzzy TOPSIS Technique (Case Study: Construction Sites in the South of Iran)

Publish Year: 1400
نوع سند: مقاله ژورنالی
زبان: English
View: 187

This Paper With 13 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_JEHSD-6-4_007

تاریخ نمایه سازی: 8 دی 1400

Abstract:

Introduction: Safety and health risk assessment in industries is associated with uncertainties due to the variables affecting it. Therefore, in this research, optimizing safety and health risk assessment was investigated in construction sites by combining a multi-criteria decision-making technique (TOPSIS) and a fuzzy system. In the present study, to answer this question, a new method was used to optimize health risk assessment in construction workshops. Materials and Methods: The case study was construction sites in Lar, a city in the south of Iran. Based on previous studies and expert opinions, ten criteria were determined to assess safety and health risks in the construction sites. Also, ۱۵ safety and health risks were identified resulting from ۱۲ types of activities in the construction sites. Triangular fuzzy numbers were used for linguistic variables in Fuzzy TOPSIS with R version ۱.۱ software. Results: Based on the results, the risk of the collapse of adjacent buildings related to the excavation process was the most important safety and health risk in the construction sites with a coefficient value of ۰.۵. Conclusion: This method can provide desired results with the least uncertainty in prioritizing safety and health risks.

Authors

Eghbal Sekhavati

Department of Environmental Engineering, Ahvaz Branch, Islamic Azad University (IAU), Ahvaz, Iran.

Reza Jalilzadeh Yengejeh

Department of Environmental Engineering, Ahvaz Branch, Islamic Azad University (IAU), Ahvaz, Iran.

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Chia ES. Risk assessment framework for project management. In ۲۰۰۶ ...
  • Gürcanli GE, Müngen U. An occupational safety risk analysis method ...
  • Edwards PJ, Bowen PA. Risk and risk management in construction: ...
  • Gangolells M, Casals M, Forcada N, et al. Mitigating construction ...
  • Boyle T. Health and safety: risk management. Routledge ; ۲۰۱۵ ...
  • El-Sayegh SM. Risk assessment and allocation in the UAE construction ...
  • Hallowell M. Safety risk perception in construction companies in the ...
  • Eaves S, Gyi DE, Gibb AG. Building healthy construction workers: ...
  • Hulshof CT, Pega F, Neupane S, et al. The effect ...
  • Amir Bahmani A, Vosoughi S, Ali Babaei A. Investigating the ...
  • Merity S, Keskar NS, Socher R. Regularizing and optimizing LSTM ...
  • Hamilton Z, Kowalski MA, Kigerl A, et al. Optimizing youth ...
  • Bond CE, Shipton ZK, Gibbs AD, et al. Structural models: ...
  • Baccarini D, Archer R. The risk ranking of projects: a ...
  • Hertz DB, Thomas H. Risk analysis and its applications. New ...
  • Lave LB. Health and safety risk analyses: information for better ...
  • Ramírez-Marengo C, de Lira-Flores J, López-Molina A, et al. A ...
  • Markowski AS, Mannan MS. ExSys-LOPA for the chemical process industry. ...
  • Mahdinia M, Yarahmadi R, Jafari M, et al. Presentation of ...
  • Tah J, Carr V. Information modeling for project risk analysis ...
  • Preyssl C. Safety risk assessment and management-the ESA approach. Reliab ...
  • Jing YH, Yang GH. Fuzzy adaptive quantized fault-tolerant control of ...
  • Krohling RA, Campanharo VC. Fuzzy TOPSIS for group decision making: ...
  • Chang TH, Wang TC. Using the fuzzy multi-criteria decision making ...
  • Yadani-Chamzini A, Basiri MH. Risk Evaluation Of Tunnelling Projects By ...
  • Haghshenas SS, Neshaei MAL, Pourkazem P, et al. The risk ...
  • Azimi R, Yazdani-Chamzini A, Fooladgar MM, et al. Evaluating the ...
  • Zadeh LA. Fuzzy sets, fuzzy logic, and fuzzy systems. World ...
  • Forat AS, Przegalińska A, Krzemiński M. Risk assessment on the ...
  • Adams FK. Risk perception and Bayesian analysis of international construction ...
  • Faber MH. Risk and safety in civil engineering. Michael H. ...
  • Bishop P, Bloomfield R. A methodology for safety case development. ...
  • Ghosh S, Jintanapakanont J. Identifying and assessing the critical risk ...
  • Cooper D, Chapman C. Risk analysis for large projects: models, ...
  • Woodruff JM. Consequence and likelihood in risk estimation: A matter ...
  • Jannadi OA, Almishari S. Risk assessment in construction. J Constr ...
  • Gowland R. The accidental risk assessment methodology for industries (ARAMIS)/layer ...
  • Marx D, Slonim A. Assessing patient safety risk before the ...
  • Tah JH, Carr V. Knowledge-based approach to construction project risk ...
  • Milstein A, Galvin R, Delbanco S, et al. Improving the ...
  • Vredenburgh AG. Organizational safety: which management practices are most effective ...
  • Zeng SX, Tam CM, Tam VW. Integrating safety, environmental and ...
  • McDermott RE, Mikulak RJ, Beauregard MR. New York: Taylor & ...
  • Lee WK. Risk assessment modeling in aviation safety management. J ...
  • Cox S. Reliability, Safety, and Risk Management. in: Ruggeri F, ...
  • Forteza FJ, Carretero-Gómez JM, Sesé A. Effects of organizational complexity ...
  • Lyons T, Skitmore M. Project risk management in the queensland ...
  • Ning X, Qi J, Wu C. A quantitative safety risk ...
  • Darabont DC, Antonov AE, Bejinariu C, editors. Key elements on ...
  • Gjerdrum D, Peter M. The new international standard on the ...
  • Robertson H. A new ISO standard for occupational health and ...
  • Zou PX, Zhang G. Comparative study on the perception of ...
  • Shaocheng T. Interval number and fuzzy number linear programmings. Fuzzy ...
  • Chen SJ, Hwang CL. Fuzzy multiple attribute decision making. Springer; ...
  • Purdy G. ISO ۳۱۰۰۰: ۲۰۰۹-setting a new standard for risk ...
  • Baybutt P. Issues for security risk assessment in the process ...
  • Gul M, Ak MF. A comparative outline for quantifying risk ...
  • نمایش کامل مراجع