First Filling of a Dam Reservoir: Case of Beris Dam Malaysia
عنوان مقاله: First Filling of a Dam Reservoir: Case of Beris Dam Malaysia
شناسه ملی مقاله: NCHP03_695
منتشر شده در اولین کنفرانس بین المللی و سومین کنفرانس ملی سد و نیروگاههای برق آبی در سال 1390
شناسه ملی مقاله: NCHP03_695
منتشر شده در اولین کنفرانس بین المللی و سومین کنفرانس ملی سد و نیروگاههای برق آبی در سال 1390
مشخصات نویسندگان مقاله:
M. IBRAHIM SAMOON - Dams Engineer ACE Pakistan, a member of the team design, supervision and monitoring of Beris dam Project, Malaysia
خلاصه مقاله:
M. IBRAHIM SAMOON - Dams Engineer ACE Pakistan, a member of the team design, supervision and monitoring of Beris dam Project, Malaysia
The first filling of Beris dam reservoir was done in a systematic manner. A procedure manual was prepared for the purpose which covered plans for water control, prefillinginspections, project surveillance, contingency and safety, and issues of public affairs, transportation and communications. It took 10 months to fill reservoir to itsnormal pool level. During that time the dam and appurtenant structures were regular ly inspected and all instrument readings were monitored. At the end of filling ateam of experts inspected the project works and interpreted all instrument records to assess safe and satisfactory performance of the project works
کلمات کلیدی: instrumentation, monitoring, reservoir, dam, maintenance
صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/138518/