Core Loading Design for Bushehr Pressurized Water Reactor

Publish Year: 1369
نوع سند: مقاله ژورنالی
زبان: English
View: 101

This Paper With 8 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_IJE-3-1_008

تاریخ نمایه سازی: 18 بهمن 1400

Abstract:

The modified out-in fuel management strategy was applied to the core loading design for the first four cycles of the Bushehr (Iran-۱) KWU designed Pressurized Water Reactor (PWR). The minimum peak-to-average power density was chosen as the objective function of the optimization process. Lattice homogenization and group constants generation were performed by using the LEOPARD computer code. For core calculations the ERUPT code was applied. The optimum core configurations were designed after several hand shufflings of fuel assemblies. For the equilibrium cycle, a satisfactory value of ۲.۷۳ was found for the peaking power factor. The average discharge burn-up of this cycle was determined to be around ۳۳,۷۰۰ MWD/MTU.