A resource-constrained project scheduling problem with fuzzy random duration

عنوان مقاله: A resource-constrained project scheduling problem with fuzzy random duration
شناسه ملی مقاله: ICIORS01_157
منتشر شده در اولین کنفرانس بین المللی تحقیق در عملیات ایران در سال 1386
مشخصات نویسندگان مقاله:

Javad Nematian - Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran
Kourosh Eshghi - Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran

خلاصه مقاله:
In this paper, first a fuzzy random resource-constrained project scheduling problem is presented. In this model, duration of project activities is a fuzzy random variable. Then the proposed model is formulated by expected value of fuzzy random variable and integer programming. The object of the problem is to find optimal scheduling of project activities. An illustrative example is also provided to clarify the concept

کلمات کلیدی:
Fuzzy random variable; Fuzzy stochastic theory; Integer programming