CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

The Master Production Schedule of Iranian Babak Copper Company

عنوان مقاله: The Master Production Schedule of Iranian Babak Copper Company
شناسه ملی مقاله: ICIRES11_030
منتشر شده در یازدهمین کنفرانس بین المللی نوآوری و تحقیق در علوم مهندسی در سال 1400
مشخصات نویسندگان مقاله:

Heidar Yazdinejad - Engineering department, Khatam University, Tehran, Iran

خلاصه مقاله:
Production scheduling involves the allocation and prioritization of optimally performing the manufacturing tasks. Clearly, minimizing the costs and increasing productivity matter the most to a production unit. Therefore, it appears necessary to adjust the activities in the program aimed at minimizing the costs and increasing productivity. Considering demand as a random variable brings the planning results closer to reality. Seeing the amount of demand as a random variable makes the problem highly complicated. In industry, copper pipes are used in different sizes and shapes (coils, pancakes, and branches), and each of these types of products has a very different manufacturing time, and thereby, different costs. We tried in this article to provide a one-month production schedule for the copper pipe factory of the Iranian Babak Copper Company by presenting a linear programming model with the objective function and the necessary constraints with the help of the Solver plugin in Excel software. Besides achieving the maximum profit, we expect the plan to meet the major needs of the market and operate compatibly with the capacity of the workstations. We also specified that which workstations should respectively add equipment to achieve a higher production capacity.

کلمات کلیدی:
Copper Pipe, Solver Plugin, Master Production Schedule

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/1422545/