CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Estimating Duration of Projects Manual Tasks Using MODAPTS plus Method

عنوان مقاله: Estimating Duration of Projects Manual Tasks Using MODAPTS plus Method
شناسه ملی مقاله: JR_RIEJ-2-1_002
منتشر شده در در سال 1392
مشخصات نویسندگان مقاله:

H. Golpira - Department of Industrial Engineering, Islamic Azad University, Sanandaj Branch, Sanandaj, Kurdistan, Iran

خلاصه مقاله:
Estimating duration of projects manual tasks is one of the crucial concepts and problems of their management and control. Methods have been used to achieve this estimation are so difficult, time consumer and basically unreliable. In this paper a new method is introduced based on modular arrangement of predetermined time standards (MODAPTS) plus method which is the well-known method of work measurement. The method is reliable according to reliability of the MODAPTS method. The method is so easy to use, so quick in application, has rapid derivation of objective standards and its analysis are regarding people and their capacities. Finally, an applicability of the method is illustrated by some general manual sample civil works and the results are shown at the end of the paper.

کلمات کلیدی:
project management, MODAPTS, Task duration estimation

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/1423046/