CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Crashing Project Time and Project Cost Optimization using Linear Programming Approach: Case Study

عنوان مقاله: Crashing Project Time and Project Cost Optimization using Linear Programming Approach: Case Study
شناسه ملی مقاله: MNGC05_024
منتشر شده در پنجمین همایش ملی مدیریت حسابداری و مهندسی صنایع در سال 1401
مشخصات نویسندگان مقاله:

S Sarlak - Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran
S.M.T Fatemi Ghomi - Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran

خلاصه مقاله:
Most construction projects are not delivered on time. In some projects, the project master wants to complete the project at the specific time that is less than the normal project completion time. Obviously, it is better to reduce the project time with lowest cost. For this paper the data is collected about a canal construction project from the project supervisor. The linear programming model is applied to find crash time for each activity. Then the model is solved by Excel software, and results are obtained for each activity. Finally, the optimal cost related to the requested crash time was determined.

کلمات کلیدی:
Project scheduling- Linear programming- Trade-off analysis- Crashing.

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/1521446/