Utilization of sequencing problem with late work criteria in operational level of supply chain:Linearization approach
Publish place: 08th International Industrial Engineering Conference
Publish Year: 1391
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,170
This Paper With 5 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IIEC08_098
تاریخ نمایه سازی: 7 آذر 1391
Abstract:
The concept of supply chain management found its way in the production planning concept in the recent decade. This chain covers four main processes whichincluded procurement of raw material (supply), production of products, distribution of the fmished products to retailers and finally covering customer's demands. By considering theproduction process as medial link in supply chain it will be possible to reduce total cost of the chain in an outstandingamount. This cause production centers prefer to play a part in the supply chain alongside with other production centersrather than continue their activities in an isolated environment. In this paper, the integration of supply chain management and sequencing problem into one unit model isstudied. This model covers three phases of supply chain that are supplier selection, production sequencing and covering customer's demands with the least tardiness. This model then is modified completely to a linearized model using different existing methods alongside a novel linearization technique which is presented for late work criteria
Keywords:
Authors
Mohammad Mousazadeh
Tehran University
Mahdi Heydari
Iran University of Science & Technolo
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :