a technique for more efficient time intergration applied to seismic analysis of power substation equipments
Publish Year: 1390
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,567
This Paper With 11 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
CESCM01_139
تاریخ نمایه سازی: 12 دی 1391
Abstract:
for analyzing the structural dynamic behaviors time integration is the most versatile tool never theless the responses of time intergration are generally being obtained after considerable computational cost and are inexact being based on the notion of convergence and its role in time integration analyses the technique replaces seismic records with excitations digitized at larger steps in view of the role of power substation equipments in and after natural hazards and the experiences existing from the pst earthquakes the objective in this paper is to examine whether we can successfully implement the technique in time integration of real power substation equipment and eventually arrive at the knowledge about the behvioirs with less computational cost
Keywords:
power substation equipments seismicanalysis , time integration , integration step size , computational cost , accuracy
Authors
m bastami
internation institute of earthquake engineeringand seismology IIEES
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :