Dynamic Multiperiod Production Planning Problem with Semi-Markovian Variable Cost
Publish place: 1st Nationall Industrial Engineering Conference
Publish Year: 1380
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,998
This Paper With 11 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IIEC01_027
تاریخ نمایه سازی: 14 مهر 1385
Abstract:
This paper develops a method for solving the single product multiperiod production planning problem, in which the production cost of each period is linear and the inventory cost of each period is concave and backlogging is not permitted. It is also assumed that the unit variable cost of the production evolves according to a continuous time Markov process. We prove that this production planning problem can be stated as a
problem of finding the dynamic shortest path from the source node to the sink node. Finally, we apply the stochastic dynamic programming to find the dynamic shortest path from the source node to the sink node and obtain the optimal production scheduled for each period.
Authors
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :