Net Present Value Maximization of a Resource-Constrained Project Scheduling Problem with Delay Penalties
Publish place: 9th International Industrial Engineering Conference
Publish Year: 1391
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,332
This Paper With 5 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IIEC09_017
تاریخ نمایه سازی: 26 اسفند 1391
Abstract:
The Resource Constrained Project Scheduling Problem (RCPSP) is been studied under different kind of constraints and limitations. In this paper, we are going to consider the discounted cash flows for project activities, including delay penalties which occur when the project make span exceeds its deadline both together as the objective function of the RCPSP. To solve the model, we will take advantage of Genetic Algorithm and Imperialist Competitive Algorithm to achieve the optimal solution of the problem. The evaluation of the algorithms performance reveals that, in comparison with ICA, GA performs better, especially in large scale problems.
Keywords:
Authors
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :