Practical Geotechnical Risk Assessment

Publish Year: 1391
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,059

This Paper With 11 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

IMT01_002

تاریخ نمایه سازی: 30 فروردین 1392

Abstract:

Systematic risk assessment procedures are well established and often rely on the principle of decision making under uncertainty, which in turn requires that one is able to assess and describe the uncertainties. Theoretical probabilistic and statistical techniques to do this are available, but have found limited use in practice. This paper will, after a brief introduction to the assessment process, provide practical techniques to deal with uncertainties, and assess risk. This is illustrated using the example of tunnel exploration planning. The techniques are spreadsheet-based, simple to implement, and obviouss to the assessor.

Authors

Karim S.Karam

Partner, Sarooj Pars Investment Company, No. ۳۵ Jami Street, Kerman, Iran

Mohsen Zarrabi

Chairman, ۱۱۵ Construction Company, No. ۵۷ Esfandiar, Valiasr Boulevard, Tehran, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Ang, A. H. and Tang W. _ 1984. Probability Concepts ...
  • Cholseky, B. 1924. Une Methode de Resolution d'un Systeme Defini ...
  • Ditlevsen, O. 1981. Uncertainty Modelling: With Applications to Multidimen sional ...
  • Einstein, H.H. Labreche, D.A., Markow, M.J., and Baecher, G.B. 1978. ...
  • Einstein, H.H. 1995. Risk and Risk Analysis in Rock Engineering, ...
  • Einstein, H.H. 1997. "Landslide Risk _ Systematic Approaches to Assessment ...
  • Einstein, H.H. and Karam, K.S. 2001. Risk Assessment and Uncertainties. ...
  • Gentle, J. E. 1998. Cholesky Factorization. Numerical Linear Algebra for ...
  • Hasofer, A.M.; Lind, N.C. 1974. Exact and Invariant Second Moment ...
  • He M.; Sousa, L.R.; Sousa, R.L.; Gomes, A.; Vargas, E. ...
  • He M.; Sousa, L.R.; Sousa, R.L.; Gomes, A.: Vargas, E. ...
  • Karam, K. 2005. Landslide Risk Assessment and Uncertainties. PhD Thesis, ...
  • Karam, K.; Karam, J.: Einstein, H. 2007b. Decisio Analysis Applied ...
  • Lacasse, S., Nadim, F. and Heeg, K. 2003. Risk Assessmet ...
  • Low, B.K. 1997. "Reliability Analysis of Rock Wedge". ASCE Journal ...
  • Nash, J. C. 1990. The Choleski Decomposition. Compact Numerical Methods ...
  • Raiffa, H. and Schlaifer, R.L. 1964. Applied Statistical Decision Theory. ...
  • Sousa, R.L. 2010. Risk Analysis for Tunnelling Projects. PhD Thesis, ...
  • Sousa, R.L and Einstein, H.H. 2011. Risk Analysis during Tunnel ...
  • Stael v. Holstein, C.A.S. 1974. A Tutorial in Decision Analysis. ...
  • Veneziano, D.V. 1974. Contribution o Second Moment Reliability. Dept. Report ...
  • نمایش کامل مراجع