Generator’s Reactive Power Support to Active Loads in a Pool Model Market

Publish Year: 1383
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,661

This Paper With 6 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

PSC19_172

تاریخ نمایه سازی: 12 آذر 1385

Abstract:

The new trend in electricity market considers reactive power as an ancillary service which should be paid for it. Unbundling reactive power support leads to a necessity for an equitable and fair allocation mechanism for this support. The allocation mechanism is a prerequisite for a pricing scheme. In this paper, first the effect of active power delivery on generators’ reactive power output is shown on a test system. Then upon definition of the problem, a simple and yet accurate method is proposed to allocate reactive power generation due to active power of load. Results of a case study using the proposed method are also presented.

Authors

Parniani

Sharif University of Technology Tehran, Iran

Maghuli

Sharif University of Technology Tehran, Iran