On the Optimal Frequency and Timing of Control Points in a Projects Life Cycle

Publish Year: 1388
نوع سند: مقاله ژورنالی
زبان: English
View: 503

This Paper With 7 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

JR_IJIEPR-20-3_002

تاریخ نمایه سازی: 7 شهریور 1393

Abstract:

The dynamic nature of projects and the fact that they are carried out in changing environments, justify the need for their periodic monitoring and control. Collection of information about the performance of projects at control points costs money. The corrective actions that may need to be taken to bring the project in line with the plan also costs money. On the other hand, penalties are usually imposed when due to no monitoring policies projects are delivered later than expected. Thence, this paper addresses two fundamental questions in this regard. First question concerns the optimal frequency of control during the life cycle of a project. The second question concerns the optimal timing of control points. Our solution methodology consists of a simulationoptimizationmodel that optimizes the timing of control points using the attraction-repulsion mechanisms borrowed from the electromagnetism theory A mathematical model is also used to optimally expedite the remaining part of the project when possible delays are to be compensated.

Authors

Hamed. R. Tareghian

is with the Department of Applied Mathematics, Faculty of Mathematical Sciences, Ferdowsi University of Mashhad.

Madjid. Salari

is with the Department of Applied Mathematics, Faculty of Mathematical Sciences, Ferdowsi University of Mashhad