CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Bi objective optimization for scheduling two-stage assembly flow shop problem in a just in time environment

عنوان مقاله: Bi objective optimization for scheduling two-stage assembly flow shop problem in a just in time environment
شناسه ملی مقاله: IIEC10_273
منتشر شده در دهمین کنفرانس بین المللی مهندسی صنایع در سال 1392
مشخصات نویسندگان مقاله:

Sahar Tadayoni Rad - Department of industrial engineering K.N. Toosi University of Technology Tehran, Iran
Saiedeh Gholami - Department of industrial engineering K.N. Toosi University of Technology Tehran, Iran
Rasoul Shafaei - Department of industrial engineering K.N. Toosi University of Technology Tehran, Iran
Hany Seidgar - Department of industrial engineering Mazandaran University of Science and Technology Babol, Iran

خلاصه مقاله:
In this paper, we proposed a new bi-objective mathematical model for two stage assembly flow shop problem (TAFSP) in just in time environment. Assembly flow shop problem (AFSP) is a special type of flexible job shop problem that has two stages. Parallel and independent machines are exists in the first stage and only one machine (assembly machine) assembled jobs in the second stage. Each job consisted of m+1 operations that process on m+1 machines in the two stage respectively. We applied -constraint method as exact approach to validate the proposed model and obtain fronts of the solutions in the solution space.

کلمات کلیدی:
Assembly flow shop problem; Just in time envirnoment

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/284169/