causes of handover delays in iranian oil pipeline projects

Publish Year: 1390
نوع سند: مقاله کنفرانسی
زبان: English
View: 746

This Paper With 19 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

IPMC07_093

تاریخ نمایه سازی: 14 شهریور 1393

Abstract:

during last few years, oil pipeline construction projects in iran have mostly experiened a delayed start of operation and final completion. There are a number of each of the project participants points of view i.e. the owner. Consultant and the contactor. this study reviews challenges in delivering lranian oil pipeline projects by focusing on the main key deliverable of the construction phase: i.e. operations acceptance and the issue of resolving commissioning and operation defects. literature review, case studies, and some interviews with involved managers ad experts were used in order to identify causes of delays.

Keywords:

oil pipeline projects: delay :delay causes: iran

Authors

narges jamal

senior project control enineer in IOPTC

M.M mortaheb

Member of educational board of sharif university (SUT)