CIRCUIT-BREAKER STRESSES DUE TO OUT-OF-PHASE SYNCHRONIZING
Publish place: 17th International Power System Conference
Publish Year: 1381
نوع سند: مقاله کنفرانسی
زبان: English
View: 2,190
This Paper With 11 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
PSC17_162
تاریخ نمایه سازی: 8 مهر 1386
Abstract:
Out-of-phase synchronizing occasionally occurs in power stations. The resulting fault current may exhibit delayed current zeros. Theses delayed current zeros have totally different causes and are quite dissimilar in comparison with the well-known delayed current zeros associated with generator terminal faults. The effect of circuitbreaker arc voltages on the course of the resulting fault current has been examined and a compatison made between generator voltage and high voltage circuit-breakers. From this comparison follows that while circuit-breakers on both
side of the main transformer are necessary from a protection point of view, the generator circuit-breaker should preferably be used for synchronizing operations.
Authors
Dieter Braun
ABB High Voltage Technologies Ltd. Zurich Switzerland ۱. Muzaffer Canay Consultant Birr Switzerland
Saeed Kianfar
Asea Brown Boveri (PJSC) Tehran Iran Georg S. Kdppl KOEPPL POWER EXPERTS Wettingen Switzerland
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :