De-aeration of a diversion tunnel of a large-scale hydroelectric scheme
Publish Year: 1383
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,827
This Paper With 8 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
HDRS_02
تاریخ نمایه سازی: 16 آذر 1384
Abstract:
Due to the influence of a varying water level in the main reservoir, the Jokulsa Tunnel as diversion tunnel from a secondary intake is subjected to a transition from free-surface to pressurized flow. As to avoid damage in the main conduit as well as of the hydraulic equipment, the air entrained into and transported downstream by the pressurized flow has to be removed before the junction of the two tunnel branches. A novel concept of de-aeration, basically consisting of vertical drill holes distributed along the Jokulsa Tunnel, was developed and technical feasibility ascertained by means of two physical hydraulic models.A concise description of the concept itself as well as of the modeling procedures is given.
Authors
Hansjürg Sigg,
Laboratory of Hydraulics, Hydrology and Glaciology (VAW), Swiss Federal Institute of Technology (ETH), Switzerland
Urs Keller,
Laboratory of Hydraulics, Hydrology and Glaciology (VAW), Swiss Federal Institute of Technology (ETH), Switzerland
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :