Estimation of Uncertainty in Abadan Refinery Gasoline Property

Publish Year: 1393
نوع سند: مقاله کنفرانسی
زبان: English
View: 516

This Paper With 5 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ICOGPP02_127

تاریخ نمایه سازی: 29 آبان 1394

Abstract:

The 1393 ministers group Act removed the oxygenate requirement but mandated the increased use of renewable fuel, such as ethanol. On the other hand the important strategy in N.I.O.R.D.C is product Euro4 (U4) gasoline. Standard ISO 17025 can we use in Reference Refinery Laboratory. One of the important items in this standard is estimation uncertainty. In this report we calculate uncertainty for all property of Abadan Refinery Gasoline

Authors

Nafiseh Joker

Management of calibration section in central Lab. Abadan refinery

Soroosh Haji Bagher Tehrani

Shift control of Abadan refinery

Zahra Amani

Chemist of calibration section in central Lab. Abadan refinery

Omid Bolvari

Chemist of control quality section in central Lab. Abadan refinery