Dredged Material Applications – A Case Study on Shahid Rajaee Port Complex
Publish Year: 1394
نوع سند: مقاله کنفرانسی
زبان: English
View: 989
This Paper With 8 Page And PDF Format Ready To Download
- Certificate
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
SMFE02_317
تاریخ نمایه سازی: 27 بهمن 1394
Abstract:
Third phase of Sahid Rajaee port complex development program including dredging is ongoing and the dredging volume in this phase is estimated to be 5 million cubic meters. Although part of this amount would be used for reclamation works but substantial amounts of dredged material would be expected to be unused and accumulated. On the other hand, due to environmental and economic considerations, accumulating enormous quantities of dredged material should be avoided. In this study the type of dredged material in third phase of this port was determined using laboratory tests. The test results showed average percentages of gravel, sand, silt and clay to be about 13, 67.5, 17.83 and 1.67, respectively. Due to the variable amounts of these percentages in the samples, specific applications for each borrow area are proposed. Among the different possible applications, reclamation, berm construction, shore protection, beach nourishment, construction materials and landfill capping are proposed and discussed.
Keywords:
Authors
Amir Rahimi
Graduated Student, School of Civil Engineering, Iran University of Science and Technology, Tehran, Iran
Mohammad Hassan Baziar
Professor, School of Civil Engineering, Iran University of Science and Technology, Tehran, Iran
Mostafa Khanzadi
Assistant Professor, School of Civil Engineering, Iran University of Science and Technology, Tehran, Iran.