Investigation and ranking of effective factors on delay inbridge construction projects using the AnalyticHierarchy Process (AHP)
عنوان مقاله: Investigation and ranking of effective factors on delay inbridge construction projects using the AnalyticHierarchy Process (AHP)
شناسه ملی مقاله: ICICA01_0176
منتشر شده در کنفرانس بین المللی عمران ، معماری و زیرساخت های شهری در سال 1394
شناسه ملی مقاله: ICICA01_0176
منتشر شده در کنفرانس بین المللی عمران ، معماری و زیرساخت های شهری در سال 1394
مشخصات نویسندگان مقاله:
Seyed Mostafa Shabanian - Departmant of civil engineering, Babol Noshirvani University of Technology
Mehdi Mohseni - Departmant of civil engineering, Allameh Mohaddes Nouri University,
Alireza Mirzagoltabar - Departmant of civil engineering, Babol Noshirvani University of Technology
خلاصه مقاله:
Seyed Mostafa Shabanian - Departmant of civil engineering, Babol Noshirvani University of Technology
Mehdi Mohseni - Departmant of civil engineering, Allameh Mohaddes Nouri University,
Alireza Mirzagoltabar - Departmant of civil engineering, Babol Noshirvani University of Technology
Today, a large part of each country’s capital, especially in developing countries, allocates to the construction and infrastructure projects. The main problem that most of big projects are faced with is delays in different phases of the project and eventually the delay on meeting the project’s final deadline. Because of having favorable geographical position, Babolsar city in Mazandaran Province are faced with high demand for construction and high volume of tourists. At present, four major bridge construction projects are being carried out to facilitate traffic throughout the city. These projects are faced with delays and as a result with additional costs. After collecting reasons for delay in projects, designing exploratory questionnaires and using Analytic Hierarchy Process (AHP) on factors effective on delay in projects as well as by weighting factors by experts, it was found that economic factors have had the greatest impact on delays
کلمات کلیدی: project, Analytic Hierarchy Process (AHP), bridge construction, delay