Management role in the quality of different phases of brickwork in residential projects in Tehran

Publish Year: 1394
نوع سند: مقاله کنفرانسی
زبان: English
View: 506

This Paper With 10 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ICSAU03_0335

تاریخ نمایه سازی: 12 تیر 1395

Abstract:

Having standards make our houses no more safe than knowing softwares of Autocad, Safe, Etabs and Sap makes a boy a civil engineer. The disaster of earthquake has always been warned in Tehran. Questions arise as to how much our buildings are constructed in order to standards? In this article, National Regulation of Building of Iran is used as rules and evaluate quality of different phases of brickwork of some projects in some workshops in a wealthy zone in north of Tehran. Even managers of these projects smoothly prefer to pay less money in primary phases. It is observed, first phases of brickworks as workshop mobilization and safety needs more attention. Bright management leads us to better workshops, better apartments to live and more sustainable urban areas

Authors

AmirReza KarimiAzeri

Assistant professor, Architecture Department, Architecture and Art Faculty, University of Guilan, Rasht.

Ali Ghadimi

Student of MA, Architecture Department, Architecture and Art Faculty, University of Guilan , University Campus2, Rasht.

Abbass Ghadimi

Student of MS, Department of Management, Firoozkooh Branch,Islamic Azad University, Firoozkooh.