Rehabilitation and Retrofit of Babolsar Concrete Pedestrian Settled Bridge

Publish Year: 1394
نوع سند: مقاله کنفرانسی
زبان: English
View: 527

This Paper With 12 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

ISSEE02_075

تاریخ نمایه سازی: 25 آذر 1395

Abstract:

The Settled Concrete Bridge or the Second Bridge of Babolsar is considered the oldest pedestrian bridge in Babolsar city of Iran along Caspian Sea shoreline. This utility bridge is constructed on Babolrud River in 1949 to facilitate commuting along its eastern and western sides for residents and tourists. The parts of the bridge are reinforced concrete and consist of four concrete piers in the river and five spans with a hinge support of almost equal lengths and a width of 2 m and length of 101 m. The bed of Babolrud River bed is too loose and unreliable because of sedimentation of deposits resulting from erosion and general scouring in upstream and there are geotechnical problems such as low bearing capacity and high settlement probability. The non-uniform settlement of 580 mm to 1320 mm had occurred in three piers of the bridge’s middle spans due to the river flooding in 1964 and local scour around the shallow foundation under the piers. Because of excessive settlement and rotation of the piers, the decks are locally bent in the support locations. In order to rehabilitate and repair the aforementioned bridge, some studies have been carried out about the geotechnical situations, hydrological conditions, the strength of structural elements of the bridge, damages estimation and approaches to rehabilitate the bridge. According to the surveys, the best approaches selected and implemented for the rehabilitation and repair of the bridge include: raising the bridge deck in three settled piers by deck seated jacking method and the use of braced metal chassis as a new piers. Then rehabilitation was done in destructed seat using concrete high-strength fibres to prepare link between the deck and the pier. The results after three years of rehabilitation and utilization have proved the functionality of the applied system in the rehabilitation of Babolsar first pedestrian bridge.

Authors

Mohsen Ahmadnezhad

Lecturer,, University of Mazandaran, Babolsar, Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Hong, S.H, "Interaction of Bridge Contraction Scour and Pier Scour ...
  • Arneson, L.A. Zevenbergen, L.W. Lagasse, P.F..Clopper, P.E., "Evaluating Scour at ...
  • DuPont, B., Allen, D.L, , "Movement and Settlements of Highway ...
  • Ainge, A.W., "Repair and Strengthening of Bridge Substructures", MS.c Theses, ...
  • Browne, T.M., Collins, T.J., Garlich, M.J., O Leary, J.E., Heringhaus, ...
  • Sprinkel, M.M., Sellars, A.R., "Concrete Bridge Protection and Rehabilitatio. Chemical ...
  • Florida Department of Transportation, "Bridge Maintenance and Repair Handbook" chapter ...
  • Georgia Department of Transportation. "Bridge Structure Maintenance and Rehabilitation Repair ...
  • Morsy, A.U., "Repair of Damietta Bridge Foundations Using Micro-Piles:A Case ...
  • نمایش کامل مراجع