CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Real Time Snubbing Force Calculation with Considering Bending Force in Horizontal Well

عنوان مقاله: Real Time Snubbing Force Calculation with Considering Bending Force in Horizontal Well
شناسه ملی مقاله: ICRSIE01_352
منتشر شده در کنفرانس بین المللی پژوهش در علوم و مهندسی در سال 1395
مشخصات نویسندگان مقاله:

D Zivar - Sharif University of Technology, Tehran, Iran
S. Jamshidi - Sharif University of Technology, Tehran, Iran.

خلاصه مقاله:
Controlling a well that goes out of control is one of the more important subject in the drilling industry. Snubbing operation is the advanced method that can be used in well control process. Snubbing define as a running pipes into the well that has pressure. Knowing the forces that can act on pipes and other snubbing unit element is useful to carry out a successful operation. This article discussed about forces act on drill pipes entered into the horizontal pressurized well using snubbing unit. It is tried in this study the effect of the curvature of well, considered with respect to the new prospect. Also force diagram versus depth for a real trajectory that is located in the Canada is present.

کلمات کلیدی:
Snubbing Force, Bending Force, Well Control, Drilling

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/537040/