Economic feasibility study of offshore wind turbine application on oil and gas jacket structures as an alternative to decommissioning in Persian Gulf

Publish Year: 1395
نوع سند: مقاله کنفرانسی
زبان: English
View: 540

This Paper With 12 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

NSMI18_326

تاریخ نمایه سازی: 6 اسفند 1395

Abstract:

Dealing with the decommissioning of offshore oil and gas infrastructures is a relatively new challenge to most oil and gas producing countries. It is obvious that experiences in building platforms are much greater than the ones in dismantling them worldwide. Complexity and costly nature of operations involving in decommissioning process requires huge investments to be done during the lifetime of the field for its decommissioning phase of the total project. Companies prefer to postpone the decommissioning phase by redevelopments as much economic as possible. Eventually if there is no other alternative for the platform to continue its economic lifetime, the company will select the strategy of decommissioning at the point of economic deficiency for the platform. There are some innovative alternatives to decommissioning which are depended on availability of tourism, aquaculture or environmental energy potentials. This paper offers an innovative alternative strategy selection method and introduces the alternative option of installing offshore wind turbines (OWT) on an abandoned platforms jacket; considering costs and benefits study between two strategies; one total decommissioning and the other one installing an OWT on the jacket of a local platform in Persian Gulf

Keywords:

Offshore platform , Decommissioning , Innovative strategy selection method , Offshore wind turbine

Authors

Mohamad baqery

M.Sc. Student at Offshore Engineering, Petroleum University of Technology;

Shahab Shahriari

M.Sc. Student at Energy Systems Engineering, Petroleum University of Technology

Pedram Edalat

Assistant Professor, Petroleum University of Technology

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
  • Siems, G. _ _ Decommis sioning Process Optimization Methodology, " ...
  • Kaiser, M. J., _ Decommiss ioning obligations: FASB 143 rules ...
  • TSB Offshore, _ Decommi ssioning costs for removal of GOM ...
  • TSB Offshore, _ _ D ec ommissioning cost update for ...
  • Kaiser, M. J., and Liu, M., _ _ D ec ...
  • Bernstein, B. B., "Evaluating Alternatives for De commissioning California's Offshore ...
  • Wang, Y., Duan, M., and Shang, J., "Application of an ...
  • TSB Offshore, _ _ Decommi ssioning Methodology and Cost Evaluation, ...
  • Abdelaah, A. M., Cresswell, S. M., Manzocchi, G. M., and ...
  • Krause, P. R., "Ecological Value _ Leave-in-Place and Reefing Options ...
  • Multon, B., "Marine Renewable Energy, " Great Britain: ISTE - ...
  • National Renewable Energy Laboratory, "Cost of Wind Energy Review, " ...
  • Chitchian, H., "Proclamation of Iran's Electricity Guaranteed Purchasing Base Rate ...
  • نمایش کامل مراجع